What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 58 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £78.90 |
| 2 | GridBeyond L0DN | £44.47 |
| 3 | Coalburn | £36.00 |
| 4 | Coalburn | £35.86 |
| 5 | Coalburn | £35.86 |
| 6 | Coalburn | £35.86 |
| 7 | Coalburn | £35.80 |
| Region | £/MWh |
|---|---|
| South Scotland | £35.9 |