What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 50 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | ECOTRICITY C05L | £77.94 |
| 2 | GridBeyond L0EN | £61.41 |
| 3 | BMUid for Sutton Bridge | £43.41 |
| 4 | Wishaw | £41.41 |
| 5 | Centrica Business Solutions S05L | £41.41 |
| Region | £/MWh |
|---|---|
| South Scotland | £41.4 |