What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 53 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £1.28 |
| 2 | West Burton B | £1.26 |
| 3 | GridBeyond L0EN | £1.00 |
| 4 | Ocker Hill | £0.52 |
| Region | £/MWh |
|---|---|
| East Midlands | £1.3 |
| Midlands | £0.5 |