What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 29 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £80.38 |
| 2 | SOUTH HUMBER BANK P/S | £75.64 |
| 3 | GridBeyond L0DN | £41.65 |
| 4 | West Burton B 3 | £27.13 |
| 5 | Spalding | £24.00 |
| 6 | Cottam Development Centre | £22.28 |
| 7 | Sloy G2 | £18.50 |