What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 64 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Staythorpe 4 | £4725.00 |
| 2 | Capenhurst | £1340.65 |
| 3 | SUNDON | £1144.66 |
| 4 | Flexitricity #01 | £1117.69 |
| 5 | Pivot Bustleholme | £975.66 |
| 6 | North Tawton | £795.32 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £1340.7 |
| Midlands | £975.7 |
| South Western | £795.3 |