What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 48 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £145.24 |
| 2 | GridBeyond L0DN | £106.71 |
| 3 | Didcot B main 5 | £87.00 |
| 4 | Pembroke 41 | £86.50 |
| 5 | Carrington Ltd - 2 | £63.38 |
| 6 | Flexitricity #04 | £56.64 |
| 7 | Brigg DG | £53.76 |