What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 76 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £181.79 |
| 2 | Dong Severn Ut 10 | £139.94 |
| 3 | Spalding | £122.00 |
| 4 | Dong Severn Ut 20 | £103.32 |