What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 40 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dong Severn Ut 20 | £0.84 |
| 2 | Dong Severn Ut 10 | £0.84 |
| 3 | Shoreham | £0.63 |
| 4 | Jamesfield 2 | £0.44 |
| 5 | Limejump Energy #02 | £0.40 |
| 6 | Limejump Energy #04 | £0.35 |
| 7 | Wormald Green | £0.34 |
| Region | £/MWh |
|---|---|
| North Scotland | £0.4 |
| Northern | £0.3 |