What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 44 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Peterhead Block 1 | £57.00 |
| 2 | ECOTRICITY C05L | £44.65 |
| 3 | Connah's Quay | £44.45 |
| 4 | GridBeyond L0DN | £43.59 |
| 5 | GridBeyond L0EN | £43.59 |
| 6 | Carrington Ltd - 2 | £33.60 |
| 7 | Cruachan | £31.11 |