What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 39 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Fasnakyle G3 | £0.48 |
| 2 | Unit 1 | £0.35 |
| 3 | UKPR MANW | £0.19 |
| 4 | GridBeyond L0DN | £0.18 |
| 5 | GridBeyond L0EN | £0.18 |
| 6 | UK Power Reserve #08 | £0.18 |
| 7 | Port of Tyne | £0.16 |
| Region | £/MWh |
|---|---|
| Northern | £0.2 |
| South Scotland | £0.1 |
| Midlands | £0.1 |