What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 73 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 31 | £34.50 |
| 2 | Pembroke 21 | £34.50 |
| 3 | UKPR MANW | £32.56 |
| 4 | UKPR East Mids | £32.55 |
| 5 | UK Power Reserve #08 | £27.71 |
| 6 | West Burton B 2 | £19.41 |