What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Optimo Energy T01N | £31.55 |
| 2 | Staythorpe 4 | £15.60 |
| 3 | GridBeyond L0DN | £7.44 |
| 4 | GridBeyond L0EN | £7.44 |
| 5 | UKPR S East | £7.41 |
| 6 | Staythorpe 1 | £7.37 |