What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Optimo Energy T01N | £62.31 |
| 2 | Shoreham | £32.06 |
| 3 | BMUid for Sutton Bridge | £25.50 |
| 4 | GridBeyond L0DN | £24.32 |
| 5 | GridBeyond L0EN | £24.32 |
| 6 | Connah's Quay | £14.28 |