What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 31 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Optimo Energy T01N | £67.86 |
| 2 | Fasnakyle G3 | £59.44 |
| 3 | GridBeyond L0DN | £50.28 |
| 4 | GridBeyond L0EN | £50.28 |
| 5 | Staythorpe 1 | £50.12 |
| 6 | Marchwood | £50.08 |
| 7 | BMUid for Sutton Bridge | £48.60 |
| Region | £/MWh |
|---|---|
| North Western | £34.2 |
| South Scotland | £32.9 |