What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 33 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Roaring Hill | £2.71 |
| 2 | Pivot Coventry | £2.23 |
| 3 | Pivot Bustleholme | £2.06 |
| Region | £/MWh |
|---|---|
| South Scotland | £2.7 |
| Midlands | £2.1 |