What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 9 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Jamesfield 2 | £5.34 |
| 2 | Fasnakyle G1 | £5.04 |
| 3 | Arbroath | £4.33 |
| 4 | Coupar | £4.23 |
| 5 | Shilton Lane | £3.23 |
| 6 | Keadby-2 Main | £3.00 |
| Region | £/MWh |
|---|---|
| North Scotland | £4.4 |
| South Scotland | £3.2 |