What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 50 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0DN | £25.04 |
| 2 | GridBeyond L0EN | £25.04 |
| 3 | West Burton B 2 | £25.04 |
| 4 | UKPR S East | £23.34 |
| 5 | Ffestiniog | £21.57 |
| 6 | Seabank Module | £18.00 |
| 7 | Shoreham | £17.87 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £15.9 |