What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 75 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Jamesfield 2 | £23.37 |
| 2 | Jamesfield 1 | £23.28 |
| 3 | Dinorwig | £22.29 |
| 4 | Roaring Hill | £21.43 |
| 5 | Drax | £18.35 |
| 6 | Drax | £18.35 |
| 7 | Drax | £18.35 |
| Region | £/MWh |
|---|---|
| North Scotland | £23.3 |
| South Scotland | £21.4 |