What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 37 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | F & S Energy #01 | £5.08 |
| 2 | Hawthorn Pit | £4.88 |
| Region | £/MWh |
|---|---|
| Northern | £4.9 |