What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 42 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £1030.50 |
| 2 | Jamesfield 2 | £764.63 |
| 3 | F & S Energy #03 | £675.42 |
| Region | £/MWh |
|---|---|
| North Scotland | £764.6 |