What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 38 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 3 | £12.59 |
| 2 | Carrington Ltd - 2 | £10.50 |
| 3 | Capenhurst | £9.50 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £9.5 |