What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Immingham CHP | £44.44 |
| 2 | Centrica Business Solutions S05L | £44.00 |
| 3 | Carrington Ltd - 2 | £32.13 |
| 4 | Coryton | £29.87 |
| 5 | Damhead Creek | £28.38 |
| 6 | Shoreham | £27.50 |