What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 34 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Immingham CHP | £8.89 |
| 2 | Keadby-2 Main | £7.06 |
| 3 | Carrington Ltd - 2 | £4.62 |
| 4 | Marchwood | £4.50 |
| 5 | Pembroke 11 | £4.47 |
| 6 | Dinorwig | £4.03 |
| 7 | Danske Commodities A/S K01G | £4.00 |
| Region | £/MWh |
|---|---|
| Midlands | £3.7 |