What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Shoreham | £22.67 |
| 2 | Octopus Energy #01 | £19.54 |
| 3 | Octopus Energy #01 | £19.54 |
| 4 | Octopus Energy #01 | £19.54 |
| 5 | Octopus Energy #01 | £19.54 |
| 6 | Dong Severn Ut 20 | £19.04 |
| 7 | BMUid for Sutton Bridge | £17.88 |
| Region | £/MWh |
|---|---|
| South Scotland | £15.3 |