What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 18 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Limejump Energy #02 | £17.57 |
| 2 | Spalding | £17.15 |
| 3 | Limejump Energy #01 | £17.04 |
| 4 | Richborough Park 2 | £16.49 |
| 5 | Richborough Park 1 | £16.48 |
| 6 | Limejump Energy #05 | £15.95 |
| 7 | Limejump Energy #03 | £15.95 |
| Region | £/MWh |
|---|---|
| South Eastern | £16.2 |