What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Enfield Centre Ltd BMU1 | £17.30 |
| 2 | Roosecote | £17.23 |
| 3 | Damhead Creek | £15.88 |
| 4 | Dong Severn Ut 10 | £13.45 |
| 5 | SOUTH HUMBER BANK P/S | £10.50 |
| 6 | Flexitricity #03 | £5.80 |
| 7 | GridBeyond L0DN | £5.79 |
| Region | £/MWh |
|---|---|
| North Western | £17.2 |