What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 8 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | THURROCK STORAGE #1 | £32.42 |
| 2 | Immingham CHP | £22.29 |
| 3 | Langage | £21.18 |
| Region | £/MWh |
|---|---|
| South Eastern | £32.4 |