What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 18 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | BMUid for Sutton Bridge | £270.33 |
| 2 | Unit 3 | £243.33 |
| 3 | Exergy Solutions E00E | £230.23 |
| 4 | Cottam Development Centre | £218.16 |
| 5 | Dong Severn Ut 10 | £180.82 |
| 6 | Damhead Creek | £139.52 |
| 7 | Shoreham | £139.52 |