What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 44 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Grain | £108.11 |
| 2 | Unit 2 | £107.84 |
| 3 | Unit 1 | £99.86 |
| 4 | Cottam Development Centre | £83.90 |
| 5 | Seabank Module | £81.25 |
| 6 | EDF Energy F01C | £79.33 |