What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 53 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 2 | £1550.32 |
| 2 | Didcot B main 5 | £1550.32 |
| 3 | Spalding | £1488.37 |
| 4 | Seabank Module | £1423.91 |
| 5 | GridBeyond L0DN | £1411.20 |
| 6 | Exergy Solutions E00E | £1360.75 |
| 7 | Carrington Ltd - 1 | £1297.50 |