What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 35 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Marchwood | £8.00 |
| 2 | Didcot B main 5 | £7.70 |
| 3 | Contego | £6.43 |
| 4 | UKPR S East | £5.79 |
| 5 | UKPR MANW | £5.42 |
| 6 | UKPR East Mids | £4.75 |
| 7 | Spalding | £4.24 |
| Region | £/MWh |
|---|---|
| South Eastern | £6.4 |