What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 64 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Centrica Business Solutions S05L | £5.44 |
| 2 | Pembroke 21 | £5.36 |
| 3 | Cottam Development Centre | £4.00 |
| 4 | GridBeyond L0DN | £3.66 |
| 5 | Rocksavage | £3.61 |
| 6 | West Burton B 1 | £3.20 |
| 7 | Dinorwig | £2.92 |