What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 15 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Native River | £5.30 |
| 2 | Marchwood | £5.18 |
| 3 | Pen y Cymoedd | £4.12 |
| Region | £/MWh |
|---|---|
| South Western | £5.3 |
| South Wales | £4.1 |