What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 37 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Great Yarmouth | £36.25 |
| 2 | Keadby-2 Main | £35.27 |
| 3 | Unit 2 | £31.68 |
| 4 | Unit 1 | £31.44 |
| 5 | Unit 3 | £31.00 |
| 6 | GridBeyond L0DN | £28.59 |
| 7 | Peterborough 3 | £21.88 |