What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 18 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Cottam Development Centre | £34.63 |
| 2 | Seabank Module | £18.00 |
| 3 | GridBeyond L0DN | £16.82 |
| 4 | Roaring Hill | £14.27 |
| 5 | Great Yarmouth | £13.88 |
| 6 | Rocksavage | £10.69 |
| Region | £/MWh |
|---|---|
| South Scotland | £14.3 |