What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 15 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Shoreham | £13.73 |
| 2 | THURROCK STORAGE #1 | £13.03 |
| 3 | Pivot Kemsley | £11.00 |
| 4 | EDFE Aggregate S Eng 02 | £9.45 |
| Region | £/MWh |
|---|---|
| South Eastern | £13.0 |