What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 10 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Cottam Development Centre | £24.13 |
| 2 | Unit 2 | £18.26 |
| 3 | Centrica Business Solutions S05L | £18.06 |
| 4 | Seabank Module 2 | £18.00 |