What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 9 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Centrica Business Solutions S05L | £6.63 |
| 2 | Unit 2 | £5.78 |
| 3 | West Burton B 2 | £5.38 |
| 4 | Carrington Ltd - 1 | £4.45 |
| 5 | GridBeyond L02E | £4.18 |
| 6 | GridBeyond L08H | £4.18 |