What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 4 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L02E | £25.82 |
| 2 | GridBeyond L08H | £25.82 |
| 3 | GridBeyond L0DN | £25.82 |
| 4 | Exergy Solutions E00E | £15.81 |
| 5 | Peterborough 3 | £7.83 |
| 6 | EDFE Aggregate S Scot 2 | £7.16 |
| 7 | EDFE Aggregate S Scotland 01 | £7.16 |