What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 26 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £27.90 |
| 2 | Staythorpe 1 | £25.90 |
| 3 | Shoreham | £24.21 |
| 4 | Rocksavage | £23.04 |
| 5 | Centrica Business Solutions S05L | £19.14 |
| 6 | SOUTH HUMBER BANK P/S | £19.13 |
| 7 | GridBeyond L0DN | £17.76 |
| Region | £/MWh |
|---|---|
| South Scotland | £12.8 |