What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 29 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Centrica Business Solutions S05L | £7.89 |
| 2 | Marchwood | £6.88 |
| 3 | EDFE Aggregate N Scot 1 | £6.40 |
| 4 | Unit 2 | £4.87 |