What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 23 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Oldham | £28.43 |
| 2 | Unit 1 | £21.85 |
| 3 | Seabank Module 2 | £21.84 |
| 4 | Skelmersdale | £19.27 |
| 5 | Limejump Energy #04 | £17.72 |
| Region | £/MWh |
|---|---|
| North Western | £27.0 |