What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 43 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | ECOTRICITY C05L | £75.07 |
| 2 | EDFE Aggregate N Scot 1 | £45.53 |
| 3 | EDF Energy F01C | £7.70 |