What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £7.09 |
| 2 | Didcot B main 5 | £6.50 |
| 3 | Blackpool | £6.37 |
| 4 | Native River | £6.19 |
| 5 | Drax | £6.01 |
| 6 | Drax | £5.90 |
| 7 | Marchwood | £5.07 |
| Region | £/MWh |
|---|---|
| South Western | £6.2 |