What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 21 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £3.00 |
| 2 | Cleve Hill Solar 1 | £2.07 |
| 3 | Limejump Energy #03 | £1.95 |
| 4 | Limejump Energy #04 | £1.94 |
| 5 | Limejump Energy #05 | £1.80 |