What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 24 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dinorwig | £9.54 |
| 2 | Unit 2 | £5.75 |
| 3 | Pembroke 51 | £5.04 |
| 4 | Port of Tyne | £5.00 |
| 5 | Pen y Cymoedd | £1.50 |
| Region | £/MWh |
|---|---|
| Northern | £5.0 |
| South Wales | £1.5 |