What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 8 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Rocksavage | £2.02 |
| 2 | EDFE Aggregate N Scot 1 | £2.00 |
| 3 | Native River | £1.68 |
| Region | £/MWh |
|---|---|
| South Western | £1.7 |