What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £5592.74 |
| 2 | Staythorpe 2 | £4914.63 |
| 3 | Staythorpe 3 | £4914.63 |
| 4 | Staythorpe 4 | £4914.62 |