What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 34 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £1480.36 |
| 2 | Staythorpe 1 | £1352.56 |
| 3 | Unit 2 | £921.19 |
| 4 | Spalding | £876.46 |
| 5 | Great Yarmouth | £745.50 |
| 6 | ECOTRICITY C05L | £702.64 |
| 7 | Centrica Business Solutions S05L | £589.53 |
| Region | £/MWh |
|---|---|
| Northern | £562.1 |
| South Wales | £413.2 |