What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 4 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Drax | £0.66 |
| 2 | Drax | £0.65 |
| 3 | Drax | £0.65 |
| 4 | Immingham CHP | £0.64 |
| 5 | Enfield Centre Ltd BMU1 | £0.51 |